PST 1300R Turbine
#1
Thread Starter
My Feedback: (38)
PST 1300R Turbine
PST 1300R turbine with 4 hours, 23 min total run time and 67 starts. Comes with everything you need to run.
- GDT (Ground Display Terminal)
- TEMS (Turbine Engine Management System)
- Fuel Pump
- Gas Solenoid Valve
- EGT Probe - K-type temperature sensor
- Battery - GFORCE 2S, 7.4 V, 2200 mAh LiPo
- ECU Power Switch with 15A slow blow fuse
This turbine starts and runs great, selling to fund a larger turbine for another project.
Specifications :
Maximum Thrust: 13 kb (28 lbs) @ 120,000 RPM
Weight: 1700 grams (3.75 lbs)
Diameter: 109 mm (4.26 inches)
Length: 300 mm (11.8 inches)
RPM Range: 40,000 - 120,000
Exhaust gas temp.: 580°C -710°C
Fuel: Jet A1, 1-K kerosene
Lubrication: approximately 5% synthetic turbine oil in the fuel
Maintenance interval: 25 hours
- GDT (Ground Display Terminal)
- TEMS (Turbine Engine Management System)
- Fuel Pump
- Gas Solenoid Valve
- EGT Probe - K-type temperature sensor
- Battery - GFORCE 2S, 7.4 V, 2200 mAh LiPo
- ECU Power Switch with 15A slow blow fuse
This turbine starts and runs great, selling to fund a larger turbine for another project.
Specifications :
Maximum Thrust: 13 kb (28 lbs) @ 120,000 RPM
Weight: 1700 grams (3.75 lbs)
Diameter: 109 mm (4.26 inches)
Length: 300 mm (11.8 inches)
RPM Range: 40,000 - 120,000
Exhaust gas temp.: 580°C -710°C
Fuel: Jet A1, 1-K kerosene
Lubrication: approximately 5% synthetic turbine oil in the fuel
Maintenance interval: 25 hours
#2
Join Date: Nov 2009
Location: Queens NYC
Posts: 73
Likes: 0
Received 0 Likes
on
0 Posts
Where would this get serviced/repaired if needed? as I know PST does not sell turbines anymore. I guess my question is where in the USA can I get this serviced if/when needed. Thanx.
Last edited by andy boy; 11-18-2019 at 02:55 PM.